Logo RG Solution

RG Solution - Vos besoins ont une raison, vos besoins ont une solution.

  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow


Home About Construction Standard

Construction standard

RoofWindows & Doors
  • DecTec R12 000 48mm membrane
  • ½" Spruce plywood
  • 2 x 8" Rafter with 2 x 6" every 16"
  • R-28 to R-20 Insulation
  • 0,006 mm Polythene construction film
  • Suspended Ceiling 24" x 24"
  • Window: 36 x 40" PVC sliding with screen
  • Outside door: 34 x 83" pre-painted steel with a 16 x 16" thermo window, lock and check chain
  • Inside Door: 30 x 80" in lauan with lock
Outside & Inside wallsElectricity
  • 7/16" Smart panel siding
  • 7/16" Glued wafer board
  • 2 x 4" K.D. Spruce studs every 16"
  • R-12 Insulation
  • 0,006mm Polythene construction film
  • Prefinished Lauan 5,2mm or Gypse
  • 120/240 volts, 60 cycles, ACNOR approved
  • 100 amp panel board with exterior post
  • Electric baseboard heating
  • Space to welcome air conditioning
  • Fluorescent lighting
  • Wall plugs and switches
  • Phone plugs
FlooringFrame
  • 7/16" Smart panel siding
  • 2 x 6" or 2 x 8" K.D. Spruce studs every 16"
  • R-20 Insulation
  • 5/8" Grooved and screwed plywood
  • Vinyl tiled floor covering
  • Reinforced steel structure
  • Axles with electric brakes
  • High quality tires
  • 2 5/16" Marvel hitch if under 15,000lbs
  • 42,000lbs ring for the hitch if over 15,000lbs
  • No frame if it is a modular construction
 
Web site realized by iClic, Internet succes creator

Web site realized by iClic,
Internet succes creator